{
  "receipt_set_id": "CWSE-EVALUATION-RECEIPTS",
  "version": "0.1.0",
  "classification": "illustrative_value",
  "normative": false,
  "engineering_approval": false,
  "status_note": "indeterminate means a check ran but lacked facts needed to decide. not_evaluated means the stage or qualified adapter did not run.",
  "evaluation_receipts": [
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-SCHEMA",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-INTERFACE",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-GEOMETRY",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-APPLICABILITY",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-HARD-GATE",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-RANKING",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CONCRETE-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-VALID-HANDOFF",
      "scenario_id": "CWSE-CONCRETE-VALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CONCRETE-VALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-VALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-SCHEMA",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CONCRETE-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-INTERFACE",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CONCRETE-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-GEOMETRY",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CONCRETE-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-APPLICABILITY",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CONCRETE-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-HARD-GATE",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CONCRETE-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-RANKING",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CONCRETE-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INVALID-HANDOFF",
      "scenario_id": "CWSE-CONCRETE-INVALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CONCRETE-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INVALID",
        "EV-CONCRETE-MATERIAL",
        "EV-PROJECT-DEMAND-CONCRETE-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-SCHEMA",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-INTERFACE",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-GEOMETRY",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-APPLICABILITY",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "indeterminate",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "indeterminate",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability ran but lacked required facts, so no decision was produced. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-HARD-GATE",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-RANKING",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE",
        "CONN-CONCRETE-CAST-IN-CHANNEL",
        "CONN-CONCRETE-POST-INSTALLED"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CONCRETE-INDETERMINATE-HANDOFF",
      "scenario_id": "CWSE-CONCRETE-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CONCRETE-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CONCRETE-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CONCRETE-INDETERMINATE",
        "EV-CONCRETE-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-SCHEMA",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-INTERFACE",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-GEOMETRY",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-APPLICABILITY",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-HARD-GATE",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-RANKING",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CLT-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-VALID-HANDOFF",
      "scenario_id": "CWSE-CLT-VALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CLT-VALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-VALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-SCHEMA",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CLT-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-INTERFACE",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CLT-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-GEOMETRY",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CLT-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-APPLICABILITY",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CLT-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-HARD-GATE",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CLT-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-RANKING",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CLT-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INVALID-HANDOFF",
      "scenario_id": "CWSE-CLT-INVALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CLT-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INVALID",
        "EV-CLT-MATERIAL",
        "EV-PROJECT-DEMAND-CLT-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-SCHEMA",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-CLT-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-INTERFACE",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-CLT-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-GEOMETRY",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-CLT-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-APPLICABILITY",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "indeterminate",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-CLT-INDETERMINATE.",
        "value": "indeterminate",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability ran but lacked required facts, so no decision was produced. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-HARD-GATE",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-CLT-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-RANKING",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE",
        "CONN-CLT-SCREW-ANGLE",
        "CONN-CLT-CONCEALED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-CLT-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-CLT-INDETERMINATE-HANDOFF",
      "scenario_id": "CWSE-CLT-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-CLT-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-CLT-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-CLT-INDETERMINATE",
        "EV-CLT-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-SCHEMA",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-INTERFACE",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-GEOMETRY",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-APPLICABILITY",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-HARD-GATE",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-RANKING",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-STEEL-VALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-VALID-HANDOFF",
      "scenario_id": "CWSE-STEEL-VALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-VALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-STEEL-VALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-VALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-VALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-SCHEMA",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-STEEL-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-INTERFACE",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-STEEL-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-GEOMETRY",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-STEEL-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-APPLICABILITY",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-STEEL-INVALID.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-HARD-GATE",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "fail",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-STEEL-INVALID.",
        "value": "fail",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening failed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-RANKING",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-STEEL-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INVALID-HANDOFF",
      "scenario_id": "CWSE-STEEL-INVALID",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INVALID"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-STEEL-INVALID.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INVALID",
        "EV-STEEL-MATERIAL",
        "EV-PROJECT-DEMAND-STEEL-INVALID"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-SCHEMA",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "schema_integrity",
      "check_id": "schema_integrity_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Schema integrity evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Schema integrity stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the schema integrity stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#schema_integrity"
      },
      "finding": "Schema integrity passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-INTERFACE",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "interface_compatibility",
      "check_id": "interface_compatibility_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE"
      ],
      "input_fact_refs": [
        "interface.cis_id",
        "interface.cis_version",
        "interface.version_compatible",
        "interface.panel_side",
        "interface.substrate_side",
        "interface.port_alignment_ok",
        "interface.signature_compatibility_ok",
        "geometry.face_orientation_ok"
      ],
      "method": {
        "name": "CWSE CTO/CIS interface compatibility evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "CTO/CIS interface compatibility stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the cto/cis interface compatibility stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#interface_compatibility"
      },
      "finding": "CTO/CIS interface compatibility passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-GEOMETRY",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "geometry_mating",
      "check_id": "geometry_mating_scenario_check",
      "status": "pass",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE"
      ],
      "input_fact_refs": [
        "geometry.plane_gap_mm",
        "geometry.normal_misalignment_deg",
        "geometry.anchor_zone_overlap_ratio"
      ],
      "method": {
        "name": "CWSE Geometric mating evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Geometric mating stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "pass",
        "unit": null
      },
      "requirement": {
        "description": "Apply the geometric mating stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#geometry_mating"
      },
      "finding": "Geometric mating passed within the stated deterministic coordination scope. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-APPLICABILITY",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "candidate_applicability",
      "check_id": "candidate_applicability_scenario_check",
      "status": "indeterminate",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "substrate.material"
      ],
      "method": {
        "name": "CWSE Candidate applicability evaluator",
        "version": "0.1.0",
        "kind": "information_completeness"
      },
      "observed": {
        "description": "Candidate applicability stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "indeterminate",
        "unit": null
      },
      "requirement": {
        "description": "Apply the candidate applicability stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#candidate_applicability"
      },
      "finding": "Candidate applicability ran but lacked required facts, so no decision was produced. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-HARD-GATE",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "deterministic_hard_gate",
      "check_id": "deterministic_hard_gate_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [
        "project.vertical_reaction_kn",
        "project.out_of_plane_reaction_kn"
      ],
      "method": {
        "name": "CWSE Deterministic hard-gate screening evaluator",
        "version": "0.1.0",
        "kind": "deterministic_precheck"
      },
      "observed": {
        "description": "Deterministic hard-gate screening stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the deterministic hard-gate screening stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#deterministic_hard_gate"
      },
      "finding": "Deterministic hard-gate screening did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-RANKING",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "scored_ranking",
      "check_id": "scored_ranking_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE",
        "CONN-STEEL-BOLTED-SHELF-ANGLE",
        "CONN-STEEL-WELDED-PLATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Scored ranking evaluator",
        "version": "0.1.0",
        "kind": "weighted_ranking"
      },
      "observed": {
        "description": "Scored ranking stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the scored ranking stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#scored_ranking"
      },
      "finding": "Scored ranking did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    },
    {
      "receipt_id": "R-CWSE-STEEL-INDETERMINATE-HANDOFF",
      "scenario_id": "CWSE-STEEL-INDETERMINATE",
      "classification": "illustrative_value",
      "stage_id": "qualified_handoff",
      "check_id": "qualified_handoff_scenario_check",
      "status": "not_evaluated",
      "engineering_approval": false,
      "subject_refs": [
        "CWSE-STEEL-INDETERMINATE"
      ],
      "input_fact_refs": [],
      "method": {
        "name": "CWSE Qualified engineering handoff evaluator",
        "version": "0.1.0",
        "kind": "qualified_handoff"
      },
      "observed": {
        "description": "Qualified engineering handoff stage status for CWSE-STEEL-INDETERMINATE.",
        "value": "not_evaluated",
        "unit": null
      },
      "requirement": {
        "description": "Apply the qualified engineering handoff stage exactly as defined by the non-normative evaluator contract.",
        "source_ref": "cwse-reference-evaluator@0.1.0#qualified_handoff"
      },
      "finding": "Qualified engineering handoff did not run. This receipt is simulated coordination evidence and is not engineering approval.",
      "evidence_refs": [
        "EV-GEOMETRY-STEEL-INDETERMINATE",
        "EV-STEEL-MATERIAL"
      ]
    }
  ]
}
